Technical Data
Acoustics
N/A
|
Ceiling
ACC
ACOUSTIC CEILING TYPENRC: 0.6-0.8, absorptive ceiling. Refer to DG / CEILING |
Communications
CO
COMMUNICATIONS/TELEPHONE POINTS4 double data points required. AUDIO VISUAL REQUIREMENTSAudio visual monitoring(CCTV) of Sick Bay may be required. WIRELESS ACCESS POINTS |
Cooling
|
Doors
DT
DOOR TYPEReception opening to have security roller shutter on the Clerical/Printing side. Space divided into two by Accordion doors.(type 2 & 3). Refer to DG / DOORS |
Drainage
N/A
|
Fire Protection
FD
FIRE DETECTION/ALARMSFire detection/alarms to comply with NCC. Refer to DG / THERMAL/SMOKE DETECTORS |
Floor
FF
FLOOR FINISHC - Carpet finish. Refer to DG / FLOOR |
|
Heating
H
HEATINGProvide heating where regionally appropriate. Refer to DG / HEATING |
Illumination
|
Keying
KY
KEYING GENERALKeyed to differ (KD). Refer to SG455 / DOOR HARDWARE / KEYING MASTER KEYINGMaster keyed - Administration & Staff (AF). Refer to SG455 / DOOR HARDWARE / KEYING |
Light
N/A
|
Planning
m^2
AREAType 1 - 18 m2 Type 2 - 32 m2 Type 3 - 53 m2 Refer to DG / AREA PLANNING - OTHERlocated adjacent to Entry Vestibule may be positioned adjacent to sick bay for supervision. Refer to DG / AREA PROPORTIONType 2 and Type 3 designed as a combined space with a dividing operable wall. Refer to DG / AREA |
Power
CM
CABLE MANAGEMENTCable management to be considered. Refer to DG / POWER GENERAL POWER OUTLETS4 double socket outlets. Refer to DG / POWER |
Security
C
SECURITY LEVEL CCategory C - Medium Security Level applies. Refer to DG / SECURITY CATEGORIES FOR OPENINGS |
Signs
DSF
DOOR SIGNAGE"OFFICE". Refer to DG / DOOR SIGNS SIGNS GENERALSAFETY NOTICE "ENSURE VENTILATION SYSTEM IN OPERATION", in a conspicuous position. Refer to DG / SIGNS |
Ventilation
|
Wall
OTH
WALL - OTHER450mm high water resistant splashback to basin, if provided. Refer to SG / LINING |
Water
N/A
|
Windows
Y
WINDOWS - YWindows are required for this space. |