Technical Data
Acoustics
R2R
ROOM TO ROOM NOISENoise to and from adjacent rooms should be considered. |
Ceiling
N/A
|
Communications
N/A
|
Cooling
N/A
|
Doors
N/A
|
Drainage
N/A
|
Fire Protection
N/A
|
Floor
FF
FLOOR FINISHPaved area. Refer to DG / FLOOR FLOOR WASTEFloor waste(s) are to be included with falls in floor. Refer to DG / DRAINAGE (& TRADE WASTE) FLOOR - OTHERFalls and stormwater pits for drainage. Refer to DG / FLOOR |
Gas
N/A
|
Heating
N/A
|
Illumination
N/A
|
Keying
N/A
|
Light
N/A
|
Power
N/A
|
|
Security
N/A
|
Signs
N/A
|
Ventilation
N/A
|
Wall
N/A
|
Water
N/A
|
Windows
N/A
|