This website contains information relating to technical standards and design criteria for projects in delivery prior to 30 March 2023 and for projects that were signed to comply with EFSG 1.0.
The information is available for department staff to use and is for reference only.
We make no representations, warranties, or assurances as to the accuracy, currency or completeness of the content contained on this website or any sites linked to this site.
Access to the EFSG 2.0 website available on the NSW Education site | Education Facilities Standards and Guidelines | Technical Standards
Important Notice: Website Changes
From November 2024, the technology used for the EFSG 1.0 website is scheduled for end-of-life. As a result, the word search bar in the top right-hand corner and the Contact Us form will no longer be available. The content and layout of the website will remain the same.
What is changing for you?