Technical Data
Acoustics
NL
NOISE LEVELSNoise levels within this space should be considered. Refer to DG / ACOUSTICS / INTERNAL NOISE LEVELS ROOM TO ROOM NOISENoise to and from adjacent rooms should be considered. ROOM ACOUSTICSRoom acoustics, particularly reverberation time should be considered. |
Ceiling
ACC
ACOUSTIC CEILING TYPEStandard ceiling. Refer to DG / CEILING |
Communications
CO
COMMUNICATIONS/TELEPHONE POINTS2 double data points required. Refer to DG / COMMUNICATIONS WIRELESS ACCESS POINTS |
Cooling
|
Doors
N/A
|
Drainage
N/A
|
Fire Protection
FD
FIRE DETECTION/ALARMSFire detection/alarms to comply with NCC. Refer to DG / THERMAL/SMOKE DETECTORS |
Floor
FF
FLOOR FINISHC - Carpet finish. Refer to DG / FLOOR |
|
Heating
H
HEATINGProvide heating where regionally appropriate. Refer to DG / HEATING |
Illumination
|
Keying
KY
KEYING GENERALKeyed to differ (KD). Refer to SG455 / DOOR HARDWARE / KEYING MASTER KEYINGMaster keyed - Administration & Staff (AF). Refer to SG455 / DOOR HARDWARE / KEYING |
Light
N/A
|
Power
CM
CABLE MANAGEMENTCable management to be considered. Refer to DG / POWER GENERAL POWER OUTLETS3 double socket outlets. Refer to DG / POWER |
|
Security
C
SECURITY LEVEL CCategory C - Medium Security Level applies. Refer to DG / SECURITY CATEGORIES FOR OPENINGS |
Signs
DSF
DOOR SIGNAGE"DEPUTY PRINCIPAL" or "ASSISTANT PRINCIPAL" Project officer, Education to determine. Refer to DG / DOOR SIGNS |
Ventilation
NV
NATURAL VENTILATION |
Wall
N/A
|
Water
N/A
|
Windows
Y
WINDOWS - YWindows are required for this space. |