Published: 2018-11-30 11:14:54 - Exported: 2024-09-04 16:46:26 | NB | The information on this sheet once printed/exported is classed as an uncontrolled copy. The currency of the information should be checked by visiting the ESFG website prior to using the information for any purposes.
Published: 2018-11-30 11:14:54 - Exported: 2024-09-04 16:46:26 | NB | The information on this sheet once printed/exported is classed as an uncontrolled copy. The currency of the information should be checked by visiting the ESFG website prior to using the information for any purposes.
As per current NATSPEC except as follows:
Supply and installation
Reference: SELECTIONS
The SELECTIONS describes furniture fixtures including loose furniture (FFE). All items are identified with a group number which indicates who is responsible for the item according to a construction industry accepted description as follows.
Group |
Description |
1 |
Provided and installed by the Contractor |
2 |
Provided by the Principal and installed by the Contractor |
3 |
Provided and installed by the Principal |
Installation
Allow to supply and install all Group 1 items
Allow to install all Group 2 items supplied by the Principal.
Group 2 items
Receive delivery of the items of Furniture, Fixtures and Equipment (FFE) at the normal site delivery point for convenient off-loading. The delivery point must be agreed to by the contractor and nominated FF&E supplier.
Promptly remove and place off- loaded FF&E in safe storage until required for final placing in the works.
Examine the items of FF&E upon delivery to ascertain whether they are in conformity with the order and whether they have been damaged in transit. Examine the FF&E immediately on delivery and any defect as to quantity or description or damage shall be brought to the notice of the carrier and noted on the document upon which receipt of the FF&E reported is acknowledged. Report defects/damages immediately to the responsible carrier and also to the Person with Full Authority/Superintendent’s representative.
Once the contractor has acknowledged the receipt of FF&E as being in good order and condition, the contractor shall be responsible for any such defect or damage that may be discovered by examination of the FF&E and shall be responsible for replacement of the FF&E at his own cost.
The contractor must sign all delivery dockets at time of receipt of FF&E items
Position the FF&E at the locations shown on the plans or in the schedules hereafter. To facilitate flexibility, most items are to be loosely placed to allow rearrangement by the Principal. Only items specifically listed as fixed are to be fixed in position. Remove packaging/wrapping from all the furniture.
When delivered, except as specified below, the items will be in a finished state and should not require any further finishing on the site, except for stopping of nail holes and touching up to match the general finish, where blemishes occur on site.
As per current NATSPEC.
As per current NATSPEC.
GUIDE NOTE: Delete all items after workmanship generally under execution in NATSPEC Building Miscellaneous Furniture - Templates / Worksection unless referenced in this subsection.
As per current NATSPEC except as follows:
Curtains and Tracks
GUIDE NOTE: Refer to SG / WINDOW COVERINGS / FABRIC for window blinds, curtains and tracks.
GUIDE NOTE: Insert project specific locations
This specifcation information is only applicable to stages less than 150m2.
Group
Group 1
Location
>
Requirements
The Early Fire Indices for curtains and stage masking assemblies must be in compliance with the Building Code of Australia (BCA).
Labels
Provide each curtain with tear resistant labels in accordance with the BCA.
Stage Maskings
Legs: Provide four pairs of legs in treated black fabric. The fabric is to be headed to 50% fullness onto 50 mm wide 100% cotton "herringbone" pattern webbing tape, with a 4 mm electro-plated link chain sewn into a canvas covered "sausage" attached to the top of 150 mm base hem to provide suitable weighting. Legs are to swivel to suit the angle of "sight line" from side of hall, swivels should be tight to prevent accidental movement. Provide brass eyelets and polished cotton ties at 300m centres for attachment to leg swivels.
Borders: Head three borders in treated black fabric headed to 50% fullness onto 50 mm wide 100% cotton "herringbone" pattern webbing tape, with 50 mm base hem. Provide brass eyelets and polished cotton ties at 300 mm centres for attachment to galvanised pipe battens.
Back Drop
Made in two halves of treated black fabric headed to 50% fullness onto 50 mm wide 100% cotton "herringbone" pattern webbing tape with a 4 mm electro-plated link chain sewn into a canvas covered "sausage" attached to the top of a 150 mm base hem to provide suitable weighting. Off-stage side hems to be 50 mm. Provide brass eyelets and polished cotton ties at 300 mm centres for attachment to the track runners.
Fabric
Type, fabric:
PFZ treated black wool drape
OR
Treated black 90% wool 10% nylon drape
GUIDE NOTE: Nominate appropriate project specific information in table below.
Item |
No. |
Fabric |
Heading |
Drop |
Fullness |
Legs |
|
|
|
|
|
Borders |
|
|
|
|
|
Back drop |
|
|
|
|
|
Back Drop Track
Heavy duty extruded aluminium stage track or an open truss steel track with low friction ball bearings type wheeled master carriers and runners. Provide single runners for every 300 mm of track, capable of carrying a minimum weight of seven kilograms.
Install track to allow the Backing Curtain to be a minimum of 750 mm off the back wall.
Masking Fixings
Fix all legs and borders to a 40NB galvanised pipe, attached to existing roof steels or purlins with special purpose clamps. All eyebolts are to be closed after installation. Extend leg batten pipe for the full width of the stage.
Group
Group 1
Location
>
Requirements
In the manufacture of curtain use only materials which comply with the requirements of the Building Code of Australia (BCA).
Labels
Provide each curtain with tear resistant labels as required by the BCA.
Curtains
Each curtain to be a permanently fire-retarded theatre curtain. Head to 100% fullness on to 50 mm 100% cotton "herringbone" pattern webbing tape with a 4 mm electro-plated link chain sewn into a canvas covered "sausage" attached to the top of a 200 mm base hem to provide suitable weighting. Side hems to be 50 mm. Provide brass eyelets and polished cotton ties at 300 mm centres for attachment to the track runners. Provide 200 mm turnbacks to the leading edge of each curtain.
Heavy duty extruded aluminium stage track or an open truss steel track with low friction ball bearings type wheeled master carriers and runners. Provide single runners for every 300 mm of track, capable of carrying a minimum weight of seven kilograms.
Operation: Curtain track to be a cord drawn assembly (minimum diameter of cord 6 mm). The track assembly is to comprise of a continuous line over a single or double pulley system with a hauling line operated by hand. Provide a fully adjustable floor mounted pulley system to take up a minimum of 200 mm of slack cord.
The overall length of the track to match the headings of the two halves of the main curtain with a centre overlap of 600 mm, and a travel offstage of the proscenium by 1.2m. Secure the main curtain track to the proscenium by means of steel brackets compatible with the track profile. Provide adequate fixing provisions for track or track supports.
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Curtain Tracks
Open truss steel track with low friction ball bearings type wheeled master carriers and runners. Provide single runners for every 300 mm of track, capable of carrying a minimum weight of seven kilograms.
Operation
The leading edge of each curtain is to have a overlapping master carrier to provide a 100 mm overlap.
The track is to be hand drawn operation.
Track is to be secured to the roof ceiling space by means of steel brackets compatible with the track profile.
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Type
Fabric:150 denier polyester @ 60gm/m2 - washable
Width: Shower opening width (or track length) x 1 1/4
Height: From head support to 50 mm clear of floor.
Hemming: Double hemmed all round with reinforced head, buttonholes sewn with heavy grade polyester thread OR sides and bottom cut with hot wire to completely seal edge.
Accessories
All out of brass
Track
Height from finished floor level: 2000 mm
Track type
Suspended extruded aluminium box section bedscreen track.
Track support brackets/assembly
Track Support: suspension hanger to match track
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Type
Proprietary translucent heavy duty flexible welding curtain/s and track system that provides protection against hazardous radiation generated during welding processes, complete with eyelets and double hem on all four sides, bottom hem chain weighted. Curtain to be able to concertina fully left and right
Proprietary Item: Flexshield
Curtain
Welding Curtain: To AS 3957
Thickness: 1mm
Clearance from floor: 300mm
Colour: Yellow/orange
Track
Heavy duty 2.5 mm thick extruded aluminium wheel track with key way for hanging
Mounting height: 2100mm above floor
Finish: clear anodised
Carriers: stainless steel and nylon dual wheel carriers
Installation
Support track securely with standard hangers to manufacturer's recommendations.
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Type
Proprietary translucent heavy duty flexible strip welding curtain/s that provides protection against hazardous radiation generated during welding processes.
Proprietary Item: Flexshield
Curtain
Welding Curtain: To AS 3957
Thickness: 2mm
Clearance from floor: 300mm
Strip overlap: 50mm
Colour: Yellow/orange
Track
Heavy duty 3.5 mm thick extruded aluminium angle to allow for both face and head mounting positions
Mounting height: 2100mm above floor
Finish: clear anodised
Requirement: fix curtain strips to track with stainless steel bolts, nyloc nuts and dished washers
Installation
Support track securely by floor mounted posts with track brackets and off partition bay wall. Align posts with side curtain tracks.
GUIDE NOTE: Insert project specific locations.
Group 1
Location
>
Material
100% pure cotton fabric lined with cotton sateen lining
Dimension: 1½ times the full width of opening, with pencil pleated curtain top on 75mm rufflette tape. Provide a 150 mm high hem at bottom and finish at finished floor level to prevent the transmission of light.
Manufacture
Curtains to be measured from site dimensions.
Track
Track: Industrial track complete with pulling cords, weights, nylon gliders/hooks and fixing brackets
Finish: clear anodised
Fixing: To ceiling members with brackets provided by the manufacturer
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Type
100% pure cotton fabric
Width: Double Fullness
Height: From head support to 50 mm clear of floor
Hemming:
Track type
Suspended extruded aluminium box section bedscreen type track.
Track support brackets/assembly
Track Support: suspension hanger to match track
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Type
Fire retarded overlapping curtain for the full height of the mirror:
OR
Labels: Provide each curtain with a tear resistant label in accordance with the BCA.
Track type
Proprietary heavy commercial light stage curtain track
Extended to enable the curtain to cover the exercise bar (barre).
Finish Anodised or laminated PVC.
Operation: Hand pull (drawn) track operation
Carriers:
Centre of carrier to be a minimum of 45mm from face of mirror
Metal curtain hooks.
Track support fixing
Group
Group 1
Location
>
Type
Fire retardant industrial PVC heavy-duty flexible curtains to effectively screen the whole Finishing Area of the Materials Workshop. Curtains to be UV stabilised, alkali and acid resistant.
Clearance from floor: 100mm
Colour: Clear
Hem: Electronically welded, 50 mm all four sides
Eyelets: Electronically welded eyelets at 200mm centres at top and 600mm centres sides and bottom
Fire retardant: To AS1441.13
Track
Two straight 30mm galvanised steel tracks at 900 to each other. Curtain hung on each track.
Trolleys: Twin wheel nylon rollers on roller bearings, attached to a metal shaft and suspension with metal rings for holding curtain.
Installation
Support track securely with standard hangers to manufacturer's recommendations.
Containers, Bins and Cabinets
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Description
An approved proprietary cabinet with all sides, roof and liquid tight floor sump fabricated in double walled zinc coated steel sheet construction including self closing, sequentially closing, key lockable doors.
Requirement: Must be suitable for the storage of all Class 3 flammable liquids.
Australian Standard: AS 4452-1997 “The Storage & Handling Of Flammable And Combustible Liquids”
Regulations of Work Cover Authority, Chemical Safety Unit
Storage capacity: 250 litres
Cabinet size: Nominal 1800 high x 1100 wide (maximum) x 500mm deep (maximum).
Graphics: Provide text and graphics as per relevant regulations
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Description
An approved under bench type proprietary cabinet with all sides, roof and liquid tight floor sump fabricated in double walled zinc coated steel sheet construction including self closing, sequentially closing, key lockable doors.
Requirement: Must be suitable for the storage of all Class 3 flammable liquids.
Australian Standard: AS 4452-1997 “The Storage & Handling Of Flammable And Combustible Liquids”
Regulations of Work Cover Authority, Chemical Safety Unit.
Storage capacity: 100 litres
Cabinet size: Nominal 800 high x 920 wide (maximum) x 620mm deep (maximum).
Graphics: Provide text and graphics as per relevant regulations.
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Description
Requirement: Kit ‘A’ compliant for NSW
Installation: fix to wall to manufacturers recommendations in locations shown on drawings.
Mounting height: Base of unit to be 1350mm above floor level
Nominal size: 455(w) x 480(h) x 185 (d)mm
Finish: White powder coated steel cabinet
Signage: Label ‘Medical Cabinet’ and with first aid symbol consisting of white cross on green background
GUIDE NOTE: Insert project specific locations.
Group 1
Location
>
Description
Type: Heavy Duty mild steel security type key cabinet
Capacity: 140 keys; non- standard size.
Dimensions (nominal:) 430H x 430W x 120D
Lock: Security lock
Hinge: 16mm diam. fixed pin mild steel
Surround: Anti-jemmy
Fixing height (nominal): 1110 mm
Installation: To manufacturer's recommendation.
Proprietary item: Trafalgar Heavy Duty Key Cabinet - Model SK01/140.
GUIDE NOTE: A 140 Key Capacity cabinet is not a standard stock size. The contractor will need to allow a lead time for manufacture.
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Description
Proprietary fully welded steel horizontal filing cabinet complete with floor stand.
Drawers: 5
Size: “AO” (paper size).
Stacking: Capable of withstanding the stacking of an additional cabinet.
Finish: Powder coated
GUIDE NOTE: Refer to manufacturer for range of colours. Include colour here or refer to the EFSG Design Guide for suggested Colours & Finishes Schemes..
Colour:
>
GUIDE NOTE:Insert project specific locations
Group
Group 1
Location
>
Description
Fire resistant (fire resistant rating 1 hour) steel security safe complete with removable shelf and a lockable drawer/s. The safe is to be secured by pick resistant key lock.
Lock: 6 lever pick resistant lock
Drawers: 1 or 2 lockable drawers
Shelf: Removable
Item 1
Item 2
Shelving Systems
GUIDE NOTE:Insert project specific locations.
Group
Group 1
Location
>
Description
Provide steel shelving with solid steel backs to the areas scheduled and where shown on the Furniture Layout drawings.
Colour:
>
GUIDE NOTE: Nominate colour. Generally a light grey colour required to blend in with school furniture. Check with MANUFACTURER/supplier for standard colour range.
Types
Adjustable Shelving (SA) of the following types:
Light Duty:
Rolled Upright type for loads up to 110 kg per shelf, five (5) intermediate shelves to be fully adjustable, complete with proprietary shelf supports, 2.175m high.
Heavy Duty:
U-Post type for loads up to 350 kg per shelf, five (5) intermediate shelves to be fully adjustable, complete with proprietary shelf supports, 2.175m high.
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Type
General: A proprietary system consisting of closed-type steel shelving units mounted on floor tracks.
Static unit location: at one end
Bases: Mount each unit on a base of structural steel sections supporting the unit between bearings, incorporating necessary bearing and guide wheels.
Bearing wheels: Cast iron, ball bearing, with crowned running surface.
Tracks: Provide bearing and guide tracks which are bright mild steel sections fixed to the structural concrete floor. Where tracks are to be flush with the finished floor surface, provide linings or edge trim for recesses required for floor guides, operating gear, or the like.
Bays:
Height: >
Width: >
Storing system: shelving
Locking: Provide a pin-tumbler lock to lock together all continuous units in a single key operation.
Dust protection: Provide replaceable resilient rubber strips to the contact edges of the units.
Shelving: Steel units, single sided in the case of end units, otherwise double sided, fitted with adjustable steel shelving, together with manufacturer’s standard accessories.
Finish: Pre-coat with a factory-applied oven baked enamel.
Methods of operation:
OR
Positioning
Shelving configuration: Position to avoid trip hazard (eg base/track extending into circulation area without a fixed unit and creating a trip hazard).
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Description
System: A proprietary steel system consisting of shelves, three-way locking device, lever lock and handle.
Size: 1842 high x 890 wide x 458mm deep (nominal).
Number of shelves: 4
Colour: Beige
Seating
GUIDE NOTE: Insert project specific locations.
Galleries are not normal provision.
Group
Group 1
Location
>
Description
Polypropylene chair shells set on cantilever brackets
Fixing: Shells 410 mm wide on epoxy powder coated cantilever brackets, drilled for bolting to concrete step risers. Bolt to anchors drilled into concrete.
Add chair shell colour and braket colour - Delete if not required.
Other Fixtures
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Type: A proprietary wall mounted plastic coated metal rack consisting of five rows of single and double pins of varying lengths.
Size: 585 wide x 610 mm high.
PVC coating colour: White.
Pins, Single: Top three rows, protective end cap attached to each pin.
Pins, Double (“U” Shaped): Bottom two rows.
Fixing height: 1100 mm from lowest fixing point to floor.
Fixing: Chrome plated brass screws.
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Description: Wall mounted plastic coated metal wire rack capable of holding glass tubing up to 1800mm long.
Size: 1800 long x 110 wide platform x 40mm upturn around platform (including ends).
Wall fixing brackets: Plastic coated, permanently fastened to rack at 900 mm centres
Fixing height from floor: 1200 mm measured from underside of rack.
Finish: PVC coated, white
Spacings between wires: 40 x 40mm (nominal).
OR
Description: Wall mounted > wide PVC perforated quad gutter complete with stop ends and gutter brackets capable of holding glass tubing up to 1800mm long.
Wall fixing: PVC gutter brackets at 600mm centres to support perforated quad gutter.
Fixing height from floor: 1200 mm measured from underside of rack (gutter).
Perforations:
GUIDE NOTE: Refer to NATSPEC Building Template / Worksection - "Retractable projection screens - hanging retractable projection screen.".
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Size: 1520 x 1520 mm (nominal)
Fixing height: 2400 mm
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
Type: Double sided folding art easel, consisting of two frames hinged at the top.
Width: 570 mm
Length: 1800 mm
Material: Fully galvanised mild steel tube
Diameter: 19 mm
Chain: Fixed to back of each shelf to prevent assembly from opening past a pre-determined opening position
Foot Inserts: Knock in type
Hinge: Top hinge assembly to allow easel to open in an "A" formation
Shelves: Adjustable support shelves
Fitting: Fit one shelf to each frame
Adjusting Knobs: Two protruding adjusting knobs to each shelf
GUIDE NOTE: Insert project specific locations.
Group
Group 1
Location
>
GUIDE NOTE: The floor lectern described below is based on Lectern Australia al200 diplomat model designed for use in schools. Other proprietary floor lecterns that are of a similar construction and comply with the specification requirements described Below may also be acceptable.
Description
Proprietary floor lectern constructed from square hollow section steel with a black powder coat finish and black MDF flat panels.
As per current NATSPEC except as follows:
Suppliers
School Furniture in this section is to be supplied under aggeregator Government Contract with OfficeMax (Contract No.DECAMU-14-21A)
Obtain the specified furniture from the following suppliers:
More details at : https://www.procurepoint.nsw.gov.au/scm0771
Mandatory requirement
Within 4 weeks of the date of the letter of acceptance submit to Department of Education the nominated furniture supplier/s furniture order for fixed and/or unfixed items of furniture. The furniture order is to be set out as in a DoE supplied template.
12 weeks before requiring the delivery of the fixed and/or unfixed items of furniture, notify the Department of Education nominated furniture supplier/s in writing of the required delivery date and obtain a written confirmation from the furniture supplier/s of the delivery date. A copy of the written confirmation is to be given to the Person with Full Authority/Superintendent.
The written notification and confirmation is to include two orders for each block (e.g. Block A, B, C as applicable); one order for fixed and one order for loose items of furniture
Delivery Examination
Examine the items of furniture upon delivery to ascertain whether they are in conformity with the order and whether they have been damaged in transit. Examine the furniture immediately on delivery and any defect as to quantity or description or damage shall be brought to the notice of the carrier and noted on the document upon which receipt of the furniture reported is acknowledged. Report defects/damages immediately to the responsible carrier and also to the Principal’s Authorised Person / Principal’s Representative.
Setting Up
Position the furniture at the locations shown on the plans or in the schedules hereafter. To facilitate educational flexibility, most items are to be loosely placed to allow rearrangement by the school. Only items specifically listed as fixed are to be fixed in position. Remove packaging/wrapping from all the furniture.
Requirement
When delivered, except as specified below, the items will be in a finished state and should not require any further finishing on the site, except for stopping of nail holes and touching up to match the general finish, where blemishes occur on site.
Finishing
Where fixed items abut one another, supply, fit and fix fillets or filling pieces at the junctions, finished to match the supplied items.
Setting Up
Set-up all loose shelves, drawers, apparatus, boxes, etc.
Services
Connection to services, where applicable, is specified under the various trade sections.
See specific methods for various items listed in the following subclauses:
Masonry Walls
Use metal expanding bolts except where otherwise stated for individual items. Do NOT use wooden plugs.
Do NOT fix into mortar joints.
Frames and Sandwich Walls
Fix into studs wherever possible or fix battens to studs to fasten into.
GUIDE NOTE: The following installation requirements applies to all bench cupboards unless nominated elsewhere within this section of the Specification Guide.
Installation
Installation: Position bench cupboards (loose and fixed) according to the plans and level up using its adjustable feet provided in bases. After adjusting feet insert cover plugs into holes in the base of the bench cupboard.
Check and adjust doors where necessary, so that gaps are even all round
Fixed bench cupboards
Service Connection: For bench cupboards requiring service connection/s link up to gas, water and electrical fittings as required. Sinks (except P.A. Trough) are supplied fitted to bench cupboards ready for connection to services.
Ventilation
Cupboards enclosing gas services must have adequate cross ventilation to prevent the build up of gas.
GUIDE NOTE: The following is a specification for standard school furniture items. Some specification information may not be relevant to each school.
Type
Installation: Position bench cupboards according to the plans and level up using its adjustable feet provided in bases.
Bench top and front: Install bench top and front as shown on drawings and specified in DG / TIMBER FIXTURES.
GUIDE NOTE: Refer to EFSG SG DRAWING / SG501/3. Insert project specific drawing number.
Drawing Reference:
>
Refer to SG / TIMBER FIXTURES
Installation: Position bench cupboards according to the plans and level up using its adjustable feet provided in bases.
Counter top and shelf: Install as shown on drawings and specified in TIMBER FIXTURES.
GUIDE NOTE: Refer to EFSG SG DRAWING / SG601/1,2,3,4,5. Insert project specific drawing numbers.
Drawing References:
>
Refer to SG / TIMBER FIXTURES
Type
Installation: Position bench cupboards according to the plans and level up using its adjustable feet provided in bases.
Service Connection: For bench cupboards requiring service connection/s link up to gas, water and electrical fittings as required.
Type
Installation: Position bench tops according to the plans.
Install tapware fittings and gas turrets as required.
GUIDE NOTE: Maximum span of bench top not to exceed 1500 mm.
Sealing: Fully seal joint between abutting tops and where tops meet the wall with a matching suitable sealant. Beads between tops must be smooth and finish flush with surface.
Type
Installation
Position benches according to the plans.
Type
Position benches according to the plans.
Type
Position benches according to the plans.
Bench, Science, Preparation (B-500)
Description: B-500 consists of a combination of the following units
Installation, Bench Cupboards: Position bench cupboards according to the plans.
Installation Top, Bench (M-99 x 2): Position bench tops on top of bench cupboards according to the plans.
Bench, Demonstration, Food Technology (B-45)
Description: B-45 consists of a combination of the following units
Installation, Bench Cupboards: Position bench cupboards according to the plans.
Installation Top, Bench (M-97): Position bench top on top of bench cupboards according to the plans.
Type
Bench, Island, Food Technology (B-90)
Description: B-90 consists of a combination of the following units
Installation, Bench Cupboards: Position bench cupboards according to the plans.
Installation Top, Bench (M-98): Position bench top on top of bench cupboards according to the plans.
Type
Installation, Position bench according to the plans
Support frame
Bench tops
Type
Darkroom Trough with Bench Support (B-70)
Installation: Position cupboards according to the plans.
Type
Student Lockers: 2 Door, Low (L-02)
4 Door (HB-1)
Installation: Position bench cupboards according to the plans and level up units.
Install lockers as indicated on drawings and securely fixed to wall.
Types
Installation
Position bench cupboards/demonstration over services, according to the plan. Cut holes appropriate for service connection (if required), fit cleats to the floor and level up units using adjustable feet provided in bases. For units which butt together, fit joining sleeves (supplied) to four corners of cupboard ends and tighten so that cupboards butt together neatly. Securely fix bench cupboards to cleats mounted on the floor.
Service Connection: Power may be drawn through base for GPO’s to be fitted to end of B-06. Bench cupboards/Demonstration are to be linked up to gas, water and electrical fittings as required.
Infill Panels: Cut and fix corner and end infill tops and face panels according to drawings.
Base Trim: Close off gaps under bases with thin continuous PVC skirting glued to bases. The strips must not obstruct the vertical space between bases, which is required for ventilation.
Sealing: Fully seal joint between abutting tops and where tops meet the wall with a matching suitable sealant. Beads between tops must be smooth and finish flush with surface.
Types
If service connections are required position bench cupboards over services, according to the plan.Cut holes appropriate for service connection.
Fit cleats to the floor and level up units using adjustable feet provided in bases. For units which butt together, fit joining sleeves (supplied) to four corners of cupboard ends and tighten so that cupboards butt together neatly. Securely fix bench cupboards to cleats mounted on the floor.
Service Connection: Bench cupboards are to be linked to water fittings as required.
Infill Panels: Cut and fix corner and end infill tops and face panels according to drawings.
Base Trim: Close off gaps under bases with thin continuous PVC skirting glued to bases. The strips must not obstruct the vertical space between bases, which is required for ventilation.
Sealing: Fully seal joint between abutting tops and where tops meet the wall with a matching suitable sealant. Beads between tops must be smooth and finish flush with surface.
Type
Bench, Woodwork, 2 Station (B-78)
Bench, Woodwork, 4 Station (Bxx)-
Installation: The Woodwork Bench is dispatched fully assembled, including vices. Position benches in room according to the plans.
Type
Bench, Metalwork, 2 Station (B-79)
Bench, Metalwork, 4 Station (B-78)
Installation: The Metalwork Bench is dispatched fully assembled, except for two (2) metalwork vices. The metalwork vices, including fixing bolts, nuts, screws and washers are packed in separate cartons for dispatch.
Metalwork vices must be mounted on benchtop directly above fixed panel on each side of bench. Use vice base as template to mark mounting hole positions, drill holes and fit vices using bolts and washers (supplied with vices).
Position benches in room according to the plans.
Type
Bench, Technical Drawing/Multi-Purpose (B-85)
Installation: The Technical Drawing Bench is despatched fully assembled, including top and fixed shelf. Position benches in room according to the plans.
Type
Bench, Workshop Demonstration (B-86)
Installation: The Workshop Demonstration Bench is dispatched as three separate item, these are:-
The final fitting of bench top and metalwork vice is to be carried out on site.
Note: Fix metalwork vice approximately centrally over open bench area, position so that handle of vice does not foul top drawer.
Use vice base as template to mark mounting hole positions, drill holes and fit vice using bolts and washers (supplied with vice).
Position benches in room according to the plans.
Types
Installation: Position cupboard units according to the plans and level up using adjustable feet provided. Abutting units to be aligned and fixed together in six (6) places through pre-drilled holes in cupboard ends using sleeve screws supplied.
Where required to be fixed, anchor units to wall through the back, close to top corners, or by an angle bracket fixed to the wall and the cupboard tops.
For anchoring unit to brick walls, use M5 expanding type bolts of suitable length. Do NOT fix in mortar joints. For timber walls use suitable length No. 12 (12g) screws and washers.
Adjust catches and hinges where necessary.
Types
Installation: Position cupboard units according to the plans and level up using adjustable feet provided. Abutting units to be aligned and fixed together in six (6) places through pre-drilled holes in cupboard ends using sleeve screws supplied.
Where required to be fixed, anchor units to wall either through back, close to top corners, or by means of an angle bracket fixed to the wall and the cupboard tops.
For anchoring unit to brick walls, use M5 expanding type bolts of suitable length. Do NOT fix in mortar joints. For timber walls use suitable length No. 12 (12g) screws and washers.
Type
Floor mounted
Installation, Generally: Cabinets may be moved by the school. Therefore, all wall and floor finishes behind them shall be continuous.
Place cabinets (loose and fixed) in position and level up using adjustable feet provided in the bases, fixed cabinets are to be securely fixed to floor and/or walls.
Where floors are uneven, close off gaps under bases of fixed cabinets with PVC skirting or thin cover strips finished to match bases. Cover vertical spaces between bases unless otherwise specified.
When fixed cabinets meet in corners, matching infill tops are available from the current DoE Furniture Supplier and must be ordered with other furniture items. Fix corner tops through cleats to walls and cabinet ends so that the top surface is level with adjoining tops. (Refer to the current DoE Furniture Supplier’s Furniture Catalogue for the range of infill or loose tops.)
Type
Cabinet, Pigeon Hole (C-26)
Installation: Can be bench or wall mounted, vertically or horizontally, with wall fixing one or two high. Arrange as indicated on the plans. Wall mounting height for single items is generally 1350 mm to underside from floor. Fix through back of cabinet in four corners. For brick walls use M5 expanding type bolts of a suitable length. For timber walls use appropriate length No.10 (10g) screws with washers.
Type
Cabinet, Wall Glass Doors, (C-27)
Installation: Position and fix units plumb on wall with underside of cabinet 1350 mm above floor, unless otherwise stated. Fix aluminium angle (provided) to the appropriate height, rest case on angle and fix cabinet at top in two (2) places through back. Screw case to bottom angle through pre-drilled holes using No. 8 (8g) x 15 mm round head screws. For brick walls use M4 expanding type bolts of suitable lengths. For timber walls use appropriate length No.10 (10g) screws (with washers for fixing through back).
Type
Cabinet, Tool (C-31)
Installation: Tool cabinets may be wall mounted individually or two high. Arrange as indicated on the plans, and fix plumb on walls, with mounting height for single items generally 1950 mm from top of item to finished floor level. Unscrew aluminium angle (fitted to underside of cabinet for transportation) and fix to wall at appropriate height. Rest cabinet on aluminium angle and fix cabinet to wall at top in two (2) places through metal brackets at top corners of back. Screw case to bottom angle through pre-drilled holes using No.10 (10 gauge) x 15 mm round head screws.
For brick walls use M6 expanding type bolts, of appropriate length. Do NOT fix in mortar joints. For timber walls use suitable length No. 12 (12g) round head screws.
Type
Cabinet, Bag Storage (C-35)
Installation: Position cabinet/s according to the plans and level up using adjustable feet provided. Abutting units to be aligned and fixed together through pre-drilled holes in cupboard ends using sleeve screws supplied.
Where required, units may be anchored to wall either through back, close to top corners, or by means of an angle bracket fixed to the wall and the cupboard tops.
For anchoring unit to brick walls, use M5 expanding type bolts of suitable length. Do NOT fix in mortar joints. For timber walls use suitable length No. 12 (12g) screws and washers.
Type
Bench, Storage Cupboard (For B-80)
Installation: Can be bench or wall mounted, vertically or horizontally, with wall fixing one or two high. Arrange as indicated on the plans. Wall mounting height for single items is generally 1350 mm to underside from floor. Fix through back of cabinet in four corners. For brick walls use M5 expanding type bolts of a suitable length. For timber walls use appropriate length No.10 (10g) screws with washers.
Type
Installation: Position and fix units level and plumb on wall 1350mm above floor, unless otherwise stated. Securely fix to wall through back of units with a minimum of six fasteners (one in each corner and in the centre top and bottom).
Fixing to building structure: Provide non-corrosive/compatible screws and washers for fixing into timber or steel framing, or masonry anchors.
Types
Installation: Fix units plumb on wall with the top level with standard door height (approx 2030 mm). Fix bottom aluminium angle to wall in four (4) places, rest case on angle and fix top of case through aluminium "T" section in four (4) places. Screw case to bottom angle through pre-drilled holes with No.10 (10g) x 15 mm CSK head screws.
For brick walls use M5 expanding type bolts, of appropriate length. Do NOT fix in mortar joints. For timber walls use suitable length No. 12 (12g) round head screws.
Type
Installation: Position and fix panels plumb on the wall, either horizontally or vertically as specified on the plans. Display Panels may be used individually or butted together to form continuous runs. The top panels should generally be level with standard door height (approx 2030 mm) or aligned with chalkboards unless otherwise specified.
Screw fix through panel not more than 50 mm in from edge. For fixing into brick walls use nylon plugs and suitable length No. 8 (8g) CSK head wood screws (without cup washers). Use similar screws for timber walls, alternatively a nail-in type plug of suitable length may be used for brick walls.
Types
Installation: Position and fix units plumb on the walls specified in the plans, with top of board at standard door height (approx 2030 mm). Fit chalkrail to board (if packaged separately for transportation) through pre-drilled holes with No. 8 (8g) x 20 mm long round head wood screws.
Fix board through aluminium "J" rail at top and through down turn of aluminium chalkrail at bottom. For brick walls use M5 expanding type bolts of suitable lengths. Fix into timber walls using No. 12 (12g) round head wood screws of suitable lengths.
Types
Installation: Fix item plumb on wall with top of board at 1950 mm above finished floor level. White Marker Board, 1200 x 1200 (Bo-19) to be fixed to wall besides chalkboards at same height (approx 2030 mm). When required, fix penrail using hardware provided. Fix to wall through eyelet lugs (if provided), or through aluminium frame in three places top and bottom.
For brick walls use M5 expanding type bolts of suitable lengths. For timber walls use No.10 (10g) round head screws of suitable length.
Type
Installation: Fix item plumb on wall with top of board at same height as adjacent White Marker Board, Bo-19 or Display Panel unless otherwise specified. When required, fix penrail using hardware provided. Fix to wall through eyelet lugs (if provided), or through aluminium frame in three places top and bottom.
For brick walls use M5 expanding type bolts of suitable lengths.
Type
Installation: Fix item plumb on wall with top of board at same height as adjacent White Marker Board (1950mm above finished floor level) unless otherwise specified. Fix penrail using hardware provided. Fix to wall through eyelet lugs (if provided), or through aluminium frame in three places top and bottom.
For masonry walls use M5 expanding type bolts of suitable lengths
Type
Install privacy panel post/s (CP-00) in position/s indicated on drawings.
Floor Fixing: Heavy duty floor fixing bracket securely screwed fixed to floor. Screw fix screen to outside of posts. Refer to drawing >.
Ceiling Fixing: Heavy duty fixing bracket securely screwed fixed to ceiling supports. Steel tube to hold posts to be welded to flange fixing plate. Refer to drawing >.
Note: Floor and ceiling fixing brackets for the privacy panel posts to be supplied and installed by the building contractor.
Types
Installation: Install privacy panels in position shown on drawings.
Type
LS- type shelving
Installation: Metal shelves are to be clipped together with their respective brackets and fitted to slots in wall strips in locations shown on the plans.
Wall Stripping (LS-032, LS-033, LS-042, LS-072, LS-082, LS-112 LS-122 and LS-172)
Wall Stripping (LS-312, LS-322, LS-343, LS-432, LS-442, LS-512, LS-522, - LS-572, LS-653, LS-752 and LS-762)
Fixing, General
For continuous runs of shelving on timber stud walls, fixing battens should be provided at correct heights behind the lining material. Where battens are not provided and studs do not coincide with spacing, timber mounting strips may be fixed to wall surface finished to match wall. For sandwich walls a timber mounting strip may be fitted vertically, fixed to studs at top and bottom of wall and in the centre with a cavity fixing device.
Type
Seat, Lecture
Installation
GUIDE NOTE: Refer to NATSPEC Building Template/ Worksection- workstations. Delete applicable workstations clauses/subclauses nominated in NATSPEC Building Template/ Worksection and include the following:
General
Workstations scheduled within the tender documents are to be installed by the contractor.
General: After completion the Department of Education may supply and install additional workstations.
Installation
Assemble and install each applicable workstation system in its required location, by means such that
Serviced Equipment
Where equipment requiring connection to power, data, telephone or the like services is shown on the Drawings or specified to be installed as part of the workstation system make the necessary connections to the appropriate building service systems.
Keyboard Supports: Where keyboard supports are required fit the keyboard support section of the computer equipment with a mechanism capable of being operated by a seated person to raise and lower the keyboard above or below the level of the work surface.
Type
Pegboard Panel (M-02)
GUIDE NOTE: Insert project specific locations.
Location
>
Installation
Fix plumb on wall with top of panel at standard door height (approx
2030 mm). Position long side horizontally unless specified otherwise on the plans.
Type
Rack, Coat Hooks (M-14) (10/92)
GUIDE NOTE: Insert project specific locations.
Location
>
Installation
Position and fix unit plumb on the walls to a height of 1200mm from the top of the top horizontal bar to circulation walkway surface.
Fix securely through units mounting plates to a masonry wall with expanding compatible metal masonry anchors. In framed wall construction, provide extra fixing noggings at correct height to allow secure fixing of rack.
Type
Rack, Bag Hooks (M-15)
GUIDE NOTE: Insert project specific locations.
Location
>
Installation
Position hook rows on walls as shown on drawings.
Level/plumb each rack and securely fix through each mounting plate to a masonry wall with expanding compatible metal masonry anchors. In framed wall construction, provide extra fixing noggings at correct height to allow secure fixing of rack.
As per current NATSPEC except as follows:
GUIDE NOTE: Delete contract types not applicable.
D.D & C and D. & C. Contracts (GC21)
General: After completion the Department of Education will supply and install all workstations with the “SW” and “TW” prefixes scheduled under “Furniture” in the Schools Facilities Standards.
For this work the Principal may use Clause COMPLETION – EARLY USE.
For other types of workstations refer to SG / MISCELLANEOUS FURNITURE / STANDARD DoE FURNITURE ITEMS / WORKSTATIONS.
GUIDE NOTE: Construct only contracts: Do not schedule workstations with the “SW” and “TW” prefixes (scheduled under “furniture” in the Educational Facilities Standards and Guidelines) within the tender documents. Refer to MISCELLANEOUS FURNITURE - Items supplied by education, installed by contractor - workstations.
Construct Only Contracts (GC21)
General: After completion the Department of Education will supply and install all workstations with the “SW” and “TW” prefixes.
For this work the Principal may use Clause COMPLETION – EARLY USE.
For other types of workstations refer to SG / MISCELLANEOUS FURNITURE / STANDARD DoE FURNITURE ITEMS / WORKSTATIONS
Minor Works contracts
General: After completion the Department of Education will supply and install workstations with the “SW” and “TW” prefixes.
For other types of workstations refer to SG / MISCELLANEOUS FURNITURE / STANDARD DoE FURNITURE ITEMS / WORKSTATIONS.
Notification
Requirement: 12 weeks (minimum) prior to completion a written notification must be given to the Department of Education’ nominated furniture supplier/s notifying them of the intended completion date. A copy of the written confirmation must also be given to the Principal’s Authorised Person / Principal’s Representative.
GUIDE NOTE: Create a job specific furniture and equipment schedule indicating which furniture or equipment items are Group 1, Group 2 or Group 3
Liaise with DoE project manager to determine group status of items.
Furniture Schedule
Item |
Group |
Comment GUIDE NOTE: E.g. LOCATION Or “refer to drawings” |
Stage, Curtains and tracks |
1 |
|
Stage Type Curtains |
1 |
|
Track for Stage Type Curtains |
1 |
|
Curtain and track for shower areas |
1 |
|
Welding Curtain |
1 |
|
Curtain for light trap |
1 |
|
Curtain for Fitting Area |
1 |
|
Curtains over Mirror |
1 |
|
Curtains to Finishing Area |
1 |
|
Containers, Bins and Cabinets |
|
|
Letter Box |
1 |
|
Shelf Units |
1 |
|
Office shelving systems |
1 |
|
Mobile shelving |
1 |
|
Workstations |
1 |
|
Seating |
1 |
|
|