Technical Data
Acoustics
N/A
|
Ceiling
N/A
|
Communications
CO
COMMUNICATIONS/TELEPHONE POINTSData points may be required. Refer to DG / COMMUNICATIONS |
Cooling
N/A
|
Doors
N/A
|
Drainage
N/A
|
Fire Protection
N/A
|
Floor
FF
FLOOR FINISHBroom finished coloured concrete to reduce glare. Refer to DG / FLOOR FLOOR WASTEFloor waste(s) are to be included with falls in floor. Refer to DG / DRAINAGE (& TRADE WASTE) FLOOR - OTHEREnsure adequate surface drainage of the area. Refer to DG / FLOOR |
Gas
N/A
|
Heating
N/A
|
Illumination
N/A
|
Keying
N/A
|
Light
N/A
|
Planning
m^2
AREAArea varies according to student numbers. To be designed for whole school assemblies. Refer to DG / AREA PLANNING - OTHERShould face a visually prominent area to act as "rostrum". Provision of shade trees and seating adjacent to Assembly Quadrangle. Refer to DG / AREA PROPORTIONPreferred shape is rectangular with ratio between 1:1 and 1:2. Area should be clear of all objects. Refer to DG / AREA |
Power
GPO
GENERAL POWER OUTLETS1 double socket outlet. Refer to DG / POWER |
Security
N/A
|
Signs
N/A
|
Ventilation
N/A
|
Wall
N/A
|
Water
N/A
|
Windows
N/A
|