Technical Data
Acoustics
N/A
|
Ceiling
N/A
|
Communications
N/A
|
Cooling
N/A
|
Doors
N/A
|
Drainage
SD
SANITARY DRAINAGE FIXTURES2 drainage outlets. Refer to DG / DRAINAGE |
Fire Protection
N/A
|
Floor
FF
FLOOR FINISHISF - Industrial sheet flooring. Refer to DG / FLOOR FLOOR WASTEFloor waste(s) are to be included with falls in floor. Refer to DG / FLOOR FLOOR - OTHERDoor threshold to be flush finished to enable wheeled equipment etc. Grade floor to floor waste is required. Refer to DG / FLOOR |
Gas
N/A
|
Heating
N/A
|
Illumination
LUX
LUX LEVEL160 lux. Refer to DG / LIGHTING LIGHTING CONTROLLighting control requirements as outlined in Design Guide. Refer to DG / LIGHTING |
Keying
KY
KEYING GENERALKeyed to Differ (KD). Refer to SG / DOOR HARDWARE / KEYING MASTER KEYINGMaster keyed - Maintenance and Cleaning Facilities (MC). Refer to SG / DOOR HARDWARE / KEYING |
Light
N/A
|
Power
GPO
GENERAL POWER OUTLETS1 double socket outlet. Refer to DG / POWER |
|
Security
B
SECURITY LEVEL BCategory B - Moderately Low Security Level applies. Refer to DG / SECURITY CATEGORIES FOR OPENINGS |
Signs
DSF
DOOR SIGNAGE"CLEANER" Refer to DG / DOOR SIGNS |
Ventilation
N/A
|
Wall
OTH
WALL - OTHER450mm high Stainless Steel Splashback to bucket sink Refer to SG / LINING |
Water
CW
COLD WATERRequired to 1 x bucket sink. Refer to DG / WATER |
Windows
OTH
WINDOWS - OTHERIf windows are included provide obscure glazing Refer to DG / WINDOWS .VISUAL PRIVACYVisual privacy is required from other spaces. |